Major Bicycle and Pedestrian Projects
The following map and project listing includes major bicycle and pedestrian projects in the CLRP of regional importance, and is a subset of the full Bicycle and Pedestrian Plan for the National Capital Region.

District of Columbia
1 Anacostia Riverwalk Trail, upgrade shared-use path
2 Construct Pedestrian Tunnel
3 Metropolitan Branch Trail, construct shared-use path
4 Oxon Run Trail Restoration, upgrade shared-use path
5 Pedestrian Bridge over Anacostia Freeway, construct pedestrian bridge
6 Rock Creek Park Trail Improvements, upgrade shared-use path
7 Theodore Roosevelt Bridge, construct pedestrian/bicycle bridge
8 Union Station Bike Station, bicycle parking
9 Watts Branch Trail, upgrade shared-use path
Maryland
10 Auth Road Sidewalks and Bike lanes, construct sidewalks and bike lanes
11 Bethesda Bikeway and Pedestrian Facilities, streetscape improvements
12 College Park Trolley Trail, construct shared-use path
13 Collington Branch Trail, construct shared-use path
14 Forest Glen Pedestrian Bridge, construct bridge
15 Henson Creek Trail Extension, construct shared-use path
16 Matthew Henson Trail, construct shared-use path
17 Ped/Bike Bridge over I-270, construct pedestrian/bicycle bridge
18 Prince George's Connector, construct shared-use path
19 Suitland Parkway Trail, construct shared-use path
20 Woodrow Wilson Bridge, construct pedestrian/bicycle bridge
Virginia
21 Accotink Gateway Connector, construct shared-use path
22 Boundary Channel Bridge Trails, construct shared-use paths
23 Bus 234 Add Signalized Crosswalks, construct streetscape/pedestrian improvements
24 Chambliss Stream Crossing, construct pedestrian/bicycle bridge
25 Columbia Pike, construct shared-use path
26 Cross County Trail, construct shared-use path
27 Duke Street Pedestrian Bridge, construct pedestrian/bicycle bridge
28 Eisenhower Trail, construct shared-use path
29 Fairfax County Parkway Bridge, add crosswalks, ped heads, sidewalk on bridge
30 Fairfax County Parkway Train, construct 8-mile shareduse path
31 George Washington Parkway Crossing, construct pedestrian/bicycle bridge
32 Georgetown Pike Multi-Use Trail, construct shared-use path
33 I-395 Shirlington Underpass, Four Mile Run Trail, construct pedestrian/bicycle bridge
34 Lee Highway, construct shared-use path
35 Linton Hall Road Widening, construct shared-use path
36 Old Dominion Drive, streetscape/pedestrian facilities
37 Old Ox Road Widening (Rt. 606), construct shared-use path
38 Potomac Avenue, streetscape/pedestrian improvements
39 Richmond Highway (US 1) Ped and Bike Improvements, construct pedestrian intersection improvement
40 Rosslyn Circle Crossing, streetscape/pedestrian improvements
41 Route 110 Trail, construct shared-use path
42 Route 123 Widening, construct shared-use path
43 Route 28 Trail Extension, construct shared-use path
44 US 50 Pedestrian Bridge, construct pedestrian/bicycle bridge
45 US 50 Pedestrian Improvements, construct streetscape/pedestrian improvements
46 VA 120 (Glebe Road) @ 27th St., install crosswalks, pedestrian signals, refuge areas.
47 VA 120 (Glebe Road) @ N. Randolph St., streetscape/pedestrian facilities
48 VA 234 Bike Trail, construct shared-use path
49 VA 846 (Sterling Boulevard) Landscaping, streetscape/pedestrian improvements
50 W&OD Trail Extension, construct shared-use path
51 Washington Boulevard Trail Phase II, construct shared-use path
52 Woodrow Wilson Bridge, construct pedestrian/bicycle bridge
|