Major Highway Improvements
The projects shown here reflect the 2012 Update to the CLRP, as it was approved on July 18, 2012.
|
District of Columbia |
1. |
I-295, reconstruct interchange at Malcolm X Blvd, 2014 |
2. |
I-395, remove 3rd St SB exit ramp, reconfigure 3rd St SB entrance and 2nd St NB exit ramps, reconnect F St bet. 2nd and 3rd St, 2016 |
3. |
11th Street Bridge reconstruction, 2013 |
4. |
Southest Boulevard, downgrade and construct urban boulevard, 2015 |
5. |
South Capitol Str/Bridge Reconstruction, including intersection with Martin Luther King Jr. Blvd, 2015, 2016 |
6. |
Wisconsin Ave, reconfigure from 4, 6 lanes to 4 lanes with a continuous left-turn lane, 2012 |
|
|
|
Maryland |
7. |
I-270/US 15 Corridor, Shady Grove to Biggs Ford Rd., widen and HOV, 2030 |
8. |
I-270, reconstruct interchange at MD 121, 2016 |
9. |
I-270, interchange at Watkins Mill Rd. Ext., 2016 |
10. |
I-70, widen to 6 lanes, 2020 |
11. |
I-70, interchange at Meadow Rd, 2020 |
12. |
I-95, interchange and CD lanes at Contee Road , 2016 |
13. |
I-95/495: Branch Avenue Metro access improvements, construct 8 lanes, 2020 |
14. |
Baltimore Washington Parkway at MD 193, Intersection Improvement, 2025 |
15. |
US 1, widen to 6 lanes reconstruct 4 lanes, 2020 |
16. |
US 301 From Charles County, MD to King George County, VA, 2030 |
17. |
US 15, reconstruct at Monocacy Blvd, 2016 |
18. |
US 29 at Musgrove/Fairland Rd, 2025 |
19. |
US 340/US 15, interchange at Jefferson Tech Park, 2016 |
20. |
US 50, westbound ramp to Columbia Park Road , 2025 |
21. |
MD 117, widen to 4 lanes, 2025 |
22. |
MD 118 (Germantown Rd.), widen to 4 lanes, 2020 |
23. |
MD 124, widen to 6 lanes, 2020 |
24. |
MD 197, widen to 4/5 lanes, 2025 |
25. |
MD 200, Intercounty Connector (ICC) Between I-95 and Baltimore Ave. (US 1), 2014 |
26. |
MD 202, reconstruct 6 lanes, 2020 |
27. |
MD 210, upgrade 6 lanes and interchange improvement, 2020, 2030 |
28. |
MD 223, widen to 4 lanes, 2020 |
29. |
MD 27, widen to 6 lanes, 2020 |
30. |
MD 28/MD 198, widen to 4, 6 lanes, 2025 |
31. |
MD 3, widen to 6 lanes, 2030 |
32. |
MD 355, construct 6 lanes, interchange at Montrose/Randolph Road, 2015, 2020 |
33. |
MD 4, widen to 6 lanes, upgrade with interchanges at Westphalia Road and Suitland Parkway, 2016, 2020, 2035 |
34. |
MD 450, widen to 4 lanes, 2016 |
35. |
MD 5, upgrade, widen to 6 lanes, including interchanges, 2016, 2025 |
36. |
MD-83, construct 4, 6 lanes, 2020 |
37. |
MD 85, widen to 4, 6 lanes, 2020 |
38. |
MD 97, construct 2 lanes, 2020 |
39. |
MD 97, upgrade intersection at MD 28, 2030 |
40. |
MD 97, upgrade intersection at Randolph Road , 2015 |
41. |
Middlebrook Road Extended, widen, construct 4 lanes, 2020 |
42. |
Montrose Parkway East, construct 4 lanes, 2015 |
43. |
Randolph Road, widen to 5 lanes, 2014 |
44. |
Suitland Parkway, interchange at Rena/Forestville Road, 2025 |
45. |
Watkins Mill Road Extended, construct 6 lanes, 2012 |
|
|
|
Virginia |
46. |
I-395 HOV lanes reversible ramp at Seminary Rd., 2015 |
47. |
I-395 Auxiliary Lanes northbound Duke St. on ramp to Seminary Rd. off ramp, 2015 |
48. |
I-495 HOT lanes interchange at VA-267 (Dulles toll Rd.) and Dulles Airport Access Rd., 2013 |
49. |
I-495 High Occupancy/Toll (HOT) lanes, Transit Service, 2013 |
50. |
I-66 HOV, includes interchange reconstruction at US 15, 2018 |
51. |
I-66, construct 3 lanes, 2020 |
52. |
I-66, construct HOV ramps to access Vienna Metro Station, 2014 |
53. |
I-66, reconstruct interchange at US 29, 2014 |
54. |
I-66/I-495, reconstruct interchange, 2013 |
55. |
I-95, construct approaches to Woodrow Wilson Bridge, 2013 |
56. |
I-95/395 HOT Lanes, widen, construct 1, 2 additional lanes and bus service, 2015 |
57. |
I-95/495, reconstruct interchange at VA 613, 2025 |
58. |
I-95/Fairfax County Parkway, enhanced interchanges for improved access to Fort Belvoir, 2013, 2015, 2020 |
59. |
I-95/I-395/I-495, interchange access ramps to I-495 HOV, 2013 |
60. |
US 1, widen to 6 lanes, 2012, 2014, 2025 |
61. |
US 1, widen to 6 lanes, 2020, 2025 |
62. |
US 15 Bypass, interchange at Edwards Ferry Road, 2035 |
63. |
US 15, widen to 4 lanes, 2015 |
64. |
US 15, widen to 4 lanes, 2040 |
65. |
US 29, interchange at VA 55, 2014 |
66. |
US 29, widen to 5, 6 lanes, 2014 |
67. |
US 29, widen to 6 lanes, 2012, 2013 |
68. |
US 50, widen to 6 lanes, 2014, 2025 |
69. |
US 50, widen/reconstruct 6 lanes including interchanges, 2013, 2015, 2025 |
70. |
VA 123, widen 6 lanes, 2025 |
71. |
VA 123, widen to 6 lanes, 2014 |
72. |
VA 123, widen to 6 lanes, 2017 |
73. |
VA 236, widen to 6 lanes, 2025 |
74. |
VA 28, widen to 6 lanes, 2017 |
75. |
VA 28, widen to 8 lanes with interchanges, 2025 |
76. |
VA 286 (VA 7100), construct 4, 6 lanes with interchanges at Franconia Pkwy. and Boudinot Dr., 2012, 2013, 2025 |
77. |
VA 286 (VA 7100), interchange at Fair Lakes Parkway, 2013 |
78. |
VA 286 (VA 7100), widen to 6 lanes, 2020 |
79. |
VA 286 (VA 7100), Fairfax County Parkway HOV, widen and upgrade to 6, 8 lanes, 2035 |
80. |
VA 294, widen to 6 lanes, 2015 |
81. |
VA 294, widen to 6 lanes, 2040 |
82. |
VA 411 Tri-County Parkway, construct 4 lanes, 2035 |
83. |
VA 7, Leesburg Pike, widen to 6, 8 lanes, 2014, 2025, 2030 |
84. |
VA 7, widen to 6 lanes, 2025 |
85. |
VA 7/US 15 Bypass, widen to 6 lanes, 2040 |
86. |
VA 7, intersection improvements at Belmont Rigde Rd., 2015 |
87. |
Battlefield Parkway, construct 4 lanes, 2012, 2020 |
88. |
Dulles Access Road, widen to 6 lanes including interchange reconstruct at I-495, 2017 |
89. |
Franconia/Springfield Parkway HOV with interchange at Neuman St., 2020, 2025 |
90. |
Manassas Battlefield Bypass, 2035 |
NOTES:
- Projects in bold are new are new to the 2011 CLRP.
- Projects in italics represent significant changes or delays of five years or more as compared to the 2010 CLRP.
- HOV = High-Occupancy Vehicle
- HOT = High-Occupancy/Toll
|