Major Transit and High-Occupancy Vehicle Improvements

The projects shown here reflect the 2014 Update to the CLRP, as it was approved on October 15, 2014.


DC

1.

DC Streetcar – 2014, 2015, 2016, 2020

  • H St./ Benning Rd. Line
  • Minnesota Ave. Spur
  • Anacostia Line
  • M St. SE/SW Line
  • Union Station to Georgetown Line

2.

Tiger Grant Bus Priority Improvements (not mapped: DC, MD, VA)

 

Maryland

3.

Corridor Cities BRT, From Shady Grove to COMSAT, 2020

4.

MARC - Increase trip capacity and frequency along all commuter rail lines, 2029

5.

Purple Line, Silver Spring to New Carrollton, 2020

6.

Silver Spring Transit Center, 2017

7.

Takoma/ Langley Park Transit Center, 2015

8.

I-270/US 15 HOV, widen including HOV, 2030

9.

Crystal City Potomac Yard Bus Way and Streetcar, 2014

10.

Dulles Corridor Metrorail Project - Phase 2, 2016

 

Virginia

11.

King St. Metro to Fairfax County line BRT, 2022

12.

Potomac Shores VRE Station and 3rd Track, 2015

13.

Potomac Yard Busway - Alexandria, 2014

14.

Potomac Yard Metro Station, 2021

15.

US 1 bus right turn lanes, 2035

16.

VA 244 (Columbia Pike) Streetcar from Pentagon City to Skyline, 2017

17.

Van Dorn St. Metro to Pentagon Metro BRT, 2016

18.

VRE - Reduce headways along the Manassas and Fredericksburg Lines, 2020

19.

I-66 HOV, Widen to 6 lanes,  HOV in additional lanes during peak, includes interchange reconstruction at US 15, 2016

20.

I-95/395 HOT Lanes, widen, construct 1, 2 additional HOT lanes and bus service, 2015

21.

VA 286 (Fairfax County Pkwy) HOV, widen to 6 lanes, HOV in additional lanes during Peak, 2035

22.

VA 289 (Franconia/Springfield Parkway), HOV lanes with interchange at Neuman St, 2025

 

NOTES:

  • Projects in bold are new are new to the 2014 CLRP.
  • HOV = High-Occupancy Vehicle
  • HOT = High-Occupancy/Toll